This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

ASG 8.201 Soft-Release

Hi Everyone,

We have released the 8.201 Up2Date package which addresses some of the "teething" bugs that 8.200 had. The current plan is to let this soft-release run until next Thursday, August 18th, at which time we will release both 8.200 and 8.201 as via Up2Date push.

In the short term after that, we'll enhance 8.2x further with 8.202, probably in a few short weeks at most. There have been a few additional internal bugs fixed, and the main point of 8.201 is to make 8.200 nice and solid before enhancing it with some shiny improvements in 8.202.

As I see a number of posts and comments in the other thread, I'll merge/move them into this one in a moment. 


ASG Up2Date 8.201 Details
News:

- Fixed: Several problems with SSL VPN
- Fixed: Problems with PDF Executive Report
- Fixed: Problems with Application Control Reporting
- Added: Support for ACC V3 Backup Rollout

Remarks:
- System will be rebooted
- Configuration will be upgraded
- Connected Wifi APs will perform firmware upgrade
- DHCP lease files will be deleted
- DHCP clients will reappear in list on their next lease refresh

Bugfixes:
[17693] AntiVirus scan fails with cssd response: 500 Internal Server Error
[18607] No Wireless-Communication between AP30 and Clients using "AVM Fritz USB WLAN-Stick N" since

Details:
Size: ~27MB
Md5: 483f2aab954bf2b19b0b4342847480a3

Download link:

http://ftp.astaro.de/Astaro_Security_Gateway/v8/up2date/u2d-sys-8.201.tgz.gpg


We will continue to monitor this thread and the 8.200 Soft-release thread until next week. Enjoy!


This thread was automatically locked due to age.
Parents
  • ... The current plan is to let this soft-release run until next Thursday, August 18th, at which time we will release both 8.200 and 8.201 as via Up2Date push...
    ...In the short term after that, we'll enhance 8.2x further with 8.202, probably in a few short weeks at most...

    Hi, I am going to come out and ask this... Since 8.1 GA, astaro seems reluctant to release the GAs on the date initially indicated. I understand that the software needs to be fully baked before it is let out to the common folk but concurrently working on seperate forks calling them x.x01 x.x02 while the original GA hasn't even been released doesn't instill too much confidence. 

    The internal numbering is for astaro's book keeping. I want the software to be bug free as anybody else so lets not release the GA period till its fully finished. I don't understand the logic behind releasing a GA that already will have atleast one if not more up2date package attached to it. 

    No software is ever 100% error free and mistakes happen once in a while but first the quiet release of 8.1 http://www.astaro.org/astaro-gateway-products/general-discussion/35660-why-lackluster-8-1-ga.html and now 8.2 seems to be following the same path.

    I understand the pressure behind the scenes to push out something fresh. But lets fix the bugs and call it 8.2 GA and lets not keep putting patches on top of a release that is not ready for deployment.

    Regards
    Bill.
Reply
  • ... The current plan is to let this soft-release run until next Thursday, August 18th, at which time we will release both 8.200 and 8.201 as via Up2Date push...
    ...In the short term after that, we'll enhance 8.2x further with 8.202, probably in a few short weeks at most...

    Hi, I am going to come out and ask this... Since 8.1 GA, astaro seems reluctant to release the GAs on the date initially indicated. I understand that the software needs to be fully baked before it is let out to the common folk but concurrently working on seperate forks calling them x.x01 x.x02 while the original GA hasn't even been released doesn't instill too much confidence. 

    The internal numbering is for astaro's book keeping. I want the software to be bug free as anybody else so lets not release the GA period till its fully finished. I don't understand the logic behind releasing a GA that already will have atleast one if not more up2date package attached to it. 

    No software is ever 100% error free and mistakes happen once in a while but first the quiet release of 8.1 http://www.astaro.org/astaro-gateway-products/general-discussion/35660-why-lackluster-8-1-ga.html and now 8.2 seems to be following the same path.

    I understand the pressure behind the scenes to push out something fresh. But lets fix the bugs and call it 8.2 GA and lets not keep putting patches on top of a release that is not ready for deployment.

    Regards
    Bill.
Children
No Data