Hi,
we're planning to upgrade our Software-Appliance Hot-Standby-Cluster this Friday evening (2x Dell PowerEdge R310 with 1x Xeon 4C/8T, 8GB RAM) from 9.409 to 9.508 (so yea, we' missed to update more often).
Our plan is also to upgrade the RAM to 32GB. Our plan is:
- Shutdown Slave (Management -> High-Avail. -> Status -> Shutdown)
- Upgrade RAM to 32GB and reboot
- It should resync, so the cluster is back again (-> is it ok to have a hot-standby cluster with different amounts of ram?)
- Do the UTM Upgrade, so that the Slave is being updated and reboots and get's the master (One switchover)
- After the sync, the slave (old-master) get's updated and after it's reboot and resync
- Shutdown the new slave and exchange ram, reboot and resync
Is this a viable path to go? Do i have to expect any issues while for a short time having nodes with diff. amounts of ram? (Currently the UTM only uses 75% while half of that is only caches)
Thanks for any hints!
This thread was automatically locked due to age.