We currently have 2 UTM525 security appliances configured in a Master/slave relationship and have purchased 2 SG550 security appliances to replace our UTM525's. Does anyone know what steps need to be taken to upgrade to the SG550 without any network downtime?
I believe we need to bring up one of the SG550's as a slave and get it configured and switch over to the master and set up the second SG550 as a slave after, but can find any steps to do this or any documentation on how to make the switch.
This thread was automatically locked due to age.