Hello,
I have to replace a cluster of 2 Sophos SG230v1 UTM in production with a brand new cluster of Sophos SG230v2 I have juste received.
I am preparing the replaecment process but I cannot find a thread that talk about this subject on the forum. Is there any process somewhere ?
Here what i am thinking of doing:
- 1 upgrade the firmware of the SG230v2 to the same version as SG230v1 in production
- load the configuration of the SG230v1 to the SG230v2 cluster
- Load the new licence key in the Sophos SG230v2
When the 2 new Sophos SG230v2 are ready, unplug the old appliance of the network and plug the 2 new ones
Is this a correct process ?
This thread was automatically locked due to age.