Hi!
I want to physically move my UTM boxes (SG310). They run in a HA setup.
My question is - how do I do this with the least amount of downtime?
I'm guessing that I should
1. shutdown (power off) the SLAVE unit (how?)
2. physically move SLAVE unit
3. reconnect all cables to SLAVE unit and power it back on
4. wait for sync
5. make SLAVE unit MASTER (how?)
6. repeat steps 1-3 for new SLAVE unit
Is this the right approach?
Also note my questions regarding shutdown of a single node (SLAVE unit) and switching MASTER role between units. (steps 1 and 5)
Kind regards
Karsten Stolten
This thread was automatically locked due to age.