I'm upgrading our Sophos Enterprise Console from 5.0 to 5.2. At the same time, I'm upgrading our server from Server2008 R2 to Server 2012 R2.
I understand the best path for the upgrade is to migrate Enterprise Console 5.0 from 2008 to 2012 and do the upgrade from 5.0 to 5.2 on the 2012 server.
However, part of the migration guide indicated that I "Stop Sophos services" while I'm doing the backup on 5.0.
I want to take the backup from the console on server 2008 and deploy it on the new server and then upgrade, but I want to do this before deploying it as I would like to test it with a small group of computers on the network before roilling it out.
So, if I stop the services and perform the backup, can I restart the services and keep that console working while I prepare the new console?
Also, how exactly will stopping these services affect the machines on my network? I want minimal interruptions while I do the backup.
Thanks.
This thread was automatically locked due to age.