This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Scheduled Operations dont work (firmware)

Hello,

I have now tried to do "scheduled operations" on some UTMs.
I can create and schedule the action.
And after the scheduled time, the status show me, all is ok.

But the UTM doesnt do the upgrade.

In the logfile of the UTM, I cant the anything.

Is there another logfile, maybe on the SUM?

Does anyone else have this problem?

SUM is 4.000-2, and the UTM is > 9


This thread was automatically locked due to age.